Our life is full of lessons that we refused to learn, just like Corona in so many ways. We are so busy with our daily routine, that we forget the importance of people, animals, and the god. We exercise the freedom to the point that we don't respect elders, children, animals and nature. Corona is teaching lessons people refuse to learn. This is a time for self-introspection. What are the things which you have been doing? What are the things which you have to improve? What are the things which you have to do differently? Once the COVID-19 travel restrictions are lifted we are going to go back to our normal ways and deplete the ozone layer and continue deforestation. Just like we track the world meter Corona infections and deaths worldwide is UN going to track the progress of making the world more nature friendly. Love and Respect Nature. Vikram April 2 2020

Wednesday, March 4, 2015


Input
9 Knowledge Area / 47 Processes
Tools & Techniques
Output
PG

INTEGRATION(4.6)


SOW, Business Case
Contract,EEF,OPA
1.Develop Project Charter
Expert Judgment
Project Charter
I
Project Charter, EEF,OPA
Output from planning
2.Develop Project Management Plan
Expert Judgment
Project Management Plan (PMP)
P1
PMP, Change Request
EEF,OPA
3.Direct and Manage Project Work
Expert Judgment, PMIS
Change Requests, Deliverables,
EEF,OPA,PMPU,PDU,WPI
E1
PMP,EEF,OPA
Performance Reports
4.Monitor and Control Project Execution
Expert Judgment
Change Requests, PMPU,PDU, WPR
Recommend correct action/repairs
M1
PMP,EEF,OPA
Change Requests
5.Perform Integrated Change Control
Expert Judgment, Change Control Meetings
Deliverables
CRSU,PMPU,PDU
M2
Deliverables PMP, OPA
6.Close Project or Phase
Expert Judgment
Final Product, Result or Service
OPA updates
C

SCOPE(5.6)


Project Charter
7.Plan Scope Management

Scope management plan
P2
Project Charter
Stakeholder Register
8.Collect Requirements
Interview, Focus Group, Observation, Prototype
Group Creativity Technique, Decision
Requirements Document
Requirement Management Plan
Requirement Traceability Matrix/RTM
P3
Requirements Document
Charter, OPA
9.Define Scope
Expert Judgment, Product Analysis,
Alternative Identification, Facilitated Workshop
Project Scope Statement
PDU
P4
Project Scope Statement
Requirements Doc, OPA
10.Create WBS
Decomposition
WBS, WBS Dictionary
Scope Baseline, PDU
P5
Scope Baseline, PMP
Requirements Document
RTM,Verified Deliverables
11.Valide Scope
Inspection
Accepted Deliverables, CR, PDU
M3
PMP, WPI, OPA,RTM
12.Control Scope
Variance Analysis
WPI/CR/OPA/PMP/PDU
M4

TIME(6.7)


WBS, Scope Baseline
EEF, OPA
13.Plan Schedule Management
Schedule management plan
P6
WBS, Scope Baseline
EEF, OPA, SMP
14.Define Activities
Expert Judgment,Roll.Wave, Decomposition
Activities and Milestone List
Activities attributes
P7
Activities & Milestone List
Scope and  OPA
15.Sequence Activities
PDM,Dependency Lead Lag Network Template
Project Schedule Network Diagram
PDU
P8
Activity List
Resource Calendar
16.Estimate Activity Resources
Alternative Analysis, Bottom up estimating
Activity Resource requirement
P9
Activity List, R Calendar
EEF, OPA
17.Estimate Activity Durations
Analogous, Parametric 3Point Reserve Analysis
Activity Duration Estimates
PDU
P10
Sched Network Diagram
EEF,OPA, Activity *
18.Develop Schedule
Critical Path/Chain, Resource Leveling, What if
Schedule Tool Analysis, Schedule Compression
Project Schedule
Schedule Baseline
P11
PMP,PS,WPI,OPA
19.Control Schedule
PR,VA,PMS,Resource Leveling, What if
Schedule Tool Analysis, Schedule Compression
WPI,OPAU,PR,CR,PMPU,PDU
M5

COST(7.4)



20. Plan Cost Management

P12
Scope Baseline, OPA,EEF
Risk Register,HRP,Sched
21.Estimate Costs
Expert, Analogous, Parametric,3Point,COQ
Vendor Bid Analysis, reserve analysis
Activity Cost Estimate (ACE)
PDU, Basis of Estimate
P13
ACE, Contracts, Scope B
Resource Calendar
Basis of Estimates
22.Determine Budget
Cost Aggregation, Reserve Analysis, Expert Judgment, Funding Limit reconciliation
Cost Performance Baseline
Project Funding Requirements
Project Document Updates
P14
PMP, PFR, WPI, OPA
23.Control Costs
Earned Value Management, TCPI
Variance Analysis, PMS
WPM, Budget Forecasts, OPA,CR, PMPU, PDU
M6
Input
QUALITY(8.3)
Output

Scope/Cost/Sch Baseline, Risk Register, EEF, OPA
24.Plan Quality
Benchmarking, COQ, Control Chart,
Statistical Sampling, Cost Benefit Analysis
Design of Experiments, QM Methodologies
QMP, Quality metrics/checklists
PIP, PDU
P15
Quality Metrics, WPI, PMP, QC Measurements
25.Perform Quality Assurance
Quality Audit, Process Analysis
CR,OPAU,PMPU,PDU
E2
PMP, Quality Checklists
26. Quality Control
Scatter Diagram, Cause Effect Diagram, Histogram, Run chart, Pareto Chart, Statistical Sampling, Inspection, Flowcharting, Approved CR, Control Charts
Validated Changes, Deliverables, QC Measurements, PMPU,PDU
M7

HR(9.4)


Activity resource requirements,
EEF, OPA
27.Develop  HR Plan
Organization charts and position descriptions
Networking,  Organization theory
Human resource plan
P15
PMP,EEF,OPA
28.Acquire Project Team
Pre-assignment, Negotiation
Acquisition, Virtual Teams
Project Staff assignments
Resource Calendars

PMP updates
E3
Project Staff Assignments
PMP
Resource calendars
29.Develop Project Team
Interpersonal Skills
Training, Ground Rules, Co-location
Team building activities
Recognition and Rewards
Team Performance assessments
EEF updates
E4
Project Staff Assignments
PMP, OPA
Team performance assessments
Performance Reports
30.Manage Project Team
Observation and Conversation
Project performance appraisals
Conflict management
Issue Log, Interpersonal Skills
EEF updates, OPA updates,
Change requests, PMP updates
E5

Communications(10.5)


SR, SMS,EEF,OPA
33.Plan Communication
Communication methods
Communication models
Communication technology
Communication requirements analysis
Communication management plan
Project Document updates
P17
PMP, PR, OPA
34.Manage communication
Communication methods
Information Distribution Tools
OPA updates
E6
PMP,WPI,OPA,
Work performance measurement,
Budget Forecast
36.Control communication
Variance Analysis
Forecasting methods
Communication methods
Reporting Systems
Performance reports
OPA updates
Change requests
M8

Risk(11.6)


Project Scope Statement
CMP,SMP,Com MP
EEF,OPA
34.Plan Risk Management
Planning Meetings and analysis
Risk management plan
P18
RMP,CMP,SMP,QMP
Activity Cost Estimates
Activity Duration Estimate
Project Documents
EEF,OPA, Scope Baseline
Stakeholder Register
35.Identify Risks
Documentation reviews
Information gathering techniques
Checklist analysis, Assumption analysis
Diagramming techniques, SWOT analysis
Expert Judgment
Risk Register
P19
Risk Register, RMP, OPA
Project Scope Statement
36.Perform Qualitative Risk Analysis
Risk Probability and Impact Assessment/Matrix
Risk data quality assessment
Risk categorization
Risk urgency assessment, Expert judgment
Risk register updates
P20
RR,RMP,CMP,SMP,OPA
37.Perform Quantitative Risk Analysis
Data gathering and representation techniques
Quantitative risk analysis and modeling techniques
Expert Judgment
Risk register updates
P21
Risk register
Risk management plan
38.Plan Risk responses
Strategy for threats and opportunity
Contingent Response Strategy
Expert Judgment
Risk register updates, PDU, PMPU
Risk related contract decisions

P22
Risk register
Project Management Plan
WPI
Performance Reports
39.Monitor and Control Risks
Risk Reassessment, Risk Audits
Variance and Trend Analysis
Technical Performance Measurement
Reserve Analysis, Status Meetings
RRU,OPAU, PMPU, PDU,
Change Requests
M9

Procurement(12.4)


Scope Baseline
Requirements documentation
Teaming agreements
Risk Register
Risk Related contract decisions
Activity resource req
Project schedule
Activity cost estimates
Cost performance baseline
EEF, OPA
40.Plan Procurement
Make-or-buy analysis
Expert judgment
Contract types
Procurement management plan
Procurement SOW
Make-or-buy decisions
Procurement documents
Source selection criteria
Change requests
P23
PMP,PD,SSC,OPA
Qualified Seller List
Seller proposals

Project documents
Make or buy decisions
Teaming agreements
41.Conduct Procurements
Bidder conferences
Proposal evaluation techniques
Independent estimates
Expert Judgment, Advertising, Internet Search,
Procurement negotiations
Selected Sellers
Procurement contract award

Resource calendars
Change requests
PMPU, PDU
E7
Procurement documents
PMPU, Contract
Performance reports
Approved change request
WPI
42.Control Procurements
Contract change control system,
Procurement performance reviews
Inspections and audits
Performance reporting
Payment systems
Claims administration
Records management system
Procurement documentation
Change requests, PMPU, OPAU
M10
PMP, PD
43.Close Procurement
Procurement audits,  Negotiated settlements
Records management system
Closed procurements, OPAU


C

44. Plan Stakeholder Management


Project Charter
Procurement Documents
EEF, OPA
45.Identify Stakeholders
Stakeholder analysis
Expert Judgment
Stakeholder register (SR)
Stakeholder management strategy (SMS)
I2
SR,SMS,PMP, OPA
Issue Log
Change Log
46. Manage Stakeholder Expectations
Communication methods
Interpersonal Skills,
Managerial Skills
OPA updates
Change requests, PMP updates
Project Document updates
E8
PMP, WPD, PD
47.Control Stakeholder Engagement
Information management system
WPI, CR, PMPU, PDU, OPAU
M11





Chapter 1)                                    Introduction                       (5 Questions)

Project is a temporary endeavor with a definite beginning and end and it creates a unique product, service or result (definition). 

Projects are progressively elaborated, meaning as the project progresses we can work on more details in the later stages.

Projects can be created because of market demand, strategic opportunity, business need, customer request, technology advance and legal requirement.

Program is a group of related projects, dependent to each other and managing them together reduces risk.

Portfolio has business goals, and aligned with strategic goals of the organization.
The projects and programs within the Portfolio may or may not be related.

Operational Work does not have a definite beginning and an end – it is ongoing and repetitive, and meant to sustain a business.

PMO – Project Management Office centralizes the management, support, or execution of projects.

PMO manages shared resource, identify and develop PM methodology, best practices and standards, Guiding and mentoring project managers, monitoring compliance with PM processes with audits, Develop and manage organization process assets(OPA)




Chapter 2) Project Life Cycle and Organizational Structure (5 Questions)

Cost, Time, Scope, Quality, Schedule, Resources, Budget, Risk that affect the project are Constraints

Stakeholders are someone whose interests maybe positively or negatively impacted by the project

Organizational Process Assets (OPA), are process related assets and knowledge base.
Enterprise Environmental Factors (EEF) include company culture, communication channels, HR, infrastructure, and political climate

Org, structure type can be functional, weak, balanced, strong matrix and pojectized

Product Lifecycle begins from conceptualization till its withdrawal
All the work that I have to do to build the product is the project scope (verb)
The features of the product is the product scope (adjective)
There are several project life cycles in a product life cycle or phase involving conception, growth, maturity, decline and withdrawal.
Project Expeditor and Coordinator are roles of Project manager in weak matrix.
Project Expeditor does not have power to make decisions

Chapter 3)            Project Management Processes    (5 Questions)

Project Management is application of knowledge, skills, tools and techniques to project activities to meet the project requirements.
                                                                                          
PM Processes are categorized into 5 process groups i.e.,
Initiating, Planning, Executing, Monitoring and Controlling and Closing

Initiation: Create and approve project charter, Define initial project, project team, product, EEF, OPA. Identify stakeholder, requirements, scope, PM and authority.
Planning: Create Project Scope Statement, WBS, PM Plan, Define team, cost, time.
      Execution: Implement PM Plan, Establish meeting rules, Find out needs of training.
      Use WAS to assign work. Adhere to policies and guidelines. Prevent problems.
      Monitoring and Controlling Measure performance, progress, and variance.
      Control schedule, cost and quality with respect to baseline. Report status
      Manage configuration, cost, time, and risk. Control changes with CRCB.
      Closing Update OPA, lessons learnt. Perform audit, Release team members.



Chapter 4)                        Integration Management                   (30 Questions)

Integration Management integrates 10 Knowledge Areas, and 5 Process Groups i.e.,
Integration, Scope, Time, Cost, Communication, Procurement, Risk, HR and Quality, Stakeholder.  Initiation, Planning, Execution, Monitoring and Controlling, Closing.

Project Charter provides high level requirements, formally recognizes and authorizes the project, links the project to ongoing work of the organization
Project Charter contains Project Title Description, Project Manager and authority level, Project Justification, Business Case, Purpose, ROI. Resources preassigned, stakeholder influence, Constraints and Assumptions, Budget.

Input of Project Charter is Contract, SoW, EEF, OPA and Business Case
Input of PM Plan is Charter, Output from planning, EEF and OPA
Input of Execution is PM Plan, Approved CR’s, EEF and OPA
Input of Monitoring and Controlling is PM plan, Performance reports, EEF, OPA
You update PM plan, PM Docs and CR, Work Performance Info. OPA throughout


Chapter 5) Scope Management                                                             (10 Questions)

Collect Requirements from Project Charter and Stakeholder Register. Will define and document stakeholder’s needs to meet project objectives. Project Success directly depends on this process.

All the work that I have to do to build the product is the project scope(Verb)
The features of the product is the product scope (Adjective)

Define Scope refines the scope from the requirements. Stakeholder needs and wants are analyzed into product and project scope. Assumptions and Constraints are documented.

Create WBS - Decomposes the scope into deliverable hierarchical decomposition, subdivides the works into smaller and manageable pieces of work.
A work package can be scheduled, cost estimated, monitored and controlled.
OPA’s have standard WBS templates that can be utilized.

Verify Scope is process to obtain formal acceptance from stakeholders. Determine if project can be terminated – performed after Quality control or sometimes in parallel.

Control Scope is process to monitor the status or project/product scope. It is also the process for managing changes to scope baseline. Ensures that all scope changes are processed through Integrated Change control.

Requirements Documentation, Group Creativity, Group Decision making techniques.
Requirements Management Plan, Requirements Traceability Matrix.

Project Scope Statement  includes Objectives, Deliverables, Scope definition, Acceptance criteria, Requirements, Constraints, Boundaries, Assumptions, project team, Configuration management, Risks, Requirements, Milestones, Specifications, Funding, Approval requirements, Cost estimate.

WBS decomposes the work into manageable components. The lowest level of manageable component is called work package – and they are scheduled, estimated, monitored and controlled.

WBS Dictionary is a companion document to the WBS – it describes the various contents and attributes of components within the WBS



Chapter 6) Time Management                                                       (20 Questions)

Define Activity input is EEF, OPA and Scope baseline. Its tools and techniques is decomposition, templates, rolling wave planning and expert judgment. Output is activity list, attributes and milestones.

Sequence Activity input is scope statement, activity list, activity attributes, milestones, OPA. Its tools and techniques is PDM, Network templates, Dependency determination, Apply leads and lags. Output is Network diagrams, Project docs.

Estimate Activity Resources input is EEF, OPA, Activity list, Activity attributes and Resource calendar. . Its tools and techniques are expert judgment, alternative analysis, published estimating data, PM Software and bottom up estimating. Output is activity resource requirement, resource breakdown structure, Project docs.

Estimate Activity Duration, input is EEF, OPA, Scope baseline, Tools and techniques is Expert judgment, Analogous and Parametric estimating. 3 point estimating, reserve analysis, Output is duration estimates, Project docs.

Develop Schedule input is EEF, OPA, Scope statement, activity list, activity attributes, network diagram, activity resource requirements, resource calendars and activity duration estimates, Tools and techniques is Network analysis, Critical path method, Schedule compression, what-if scenarios, resource leveling, critical chain method, PM software, adjust leads and lags. Output is project schedule baseline.

Control Schedule input is PM plan, OPA Tools and Techniques is Performance Reviews, Variance analysis, Schedule compression, What-if scenario, Resource leveling, scheduling tool, adjust leads and lags. Output is work performance updates, OPA updates, project docs, PM plan updates to schedule baseline, management plan, cost baseline. Project doc updates to schedule data and project schedule.

Network Diagram can be drawn using PDM or ADM method. It can be used to show interdependencies of activities need to happen in specific sequence, compress schedule, show project progress and help justify your time estimate for the project

Precedence Diagram method, PDM is also known as AON, Activity on Node.
Includes Start to Start, Start to Finish, Finish to Start, and Finish to Finish.
Arrow Diagramming method, ADM is also known as AOA, Activity on Arrow
Includes start to finish only

Estimating Methodologies includes BEAT-PPP, Bottom up estimating, Expert judgment, Analogous estimating, Parametric estimating, Three point (O+M+P)/3, is triangular distribution.
Weighted or 3 Beta distribution is:
PERT (O + 4M +P) /6. Activity Standard Deviation is P-0 /6, variance (P-O/6) ^2
Resource Calendars tell us which resources are available during planned project activities, used to estimate resource utilization, includes resource names, geographical are, skill set, experience level, availability and capability.

Reserve Analysis is required project management to accommodate the time and cost risk in a project through the use of Contingency or Management reserve.

Critical Path Method helps prove how long the project will take – it is the longest duration path through a network diagram and determines the shortest time to complete the project. Helps determine if a issue needs immediate attention.

There are 3 types of Float
Total Float - The amount of time an activity can be delayed without delaying the project end date or an intermediary milestone.
Free Float – The amount of time an activity can be delayed without delaying the early start date of its successor
Project Float – The amount of time a project can be delayed without delaying the externally imposed project completion date required by the customer, management, or previously committed to by the project manager.

Critical Chain Method helps to build a schedule resource optimized critical path in critical chain. It takes into account both activity and resource dependencies. Build a critical path à apply resource limitations, constraints à obtain a critical chain.
Includes Project Buffer, Feeding Buffer.

Resource Leveling, applied to a schedule that has been analyzed by the critical path method. RL is produces resource limited schedule, is necessary if resources are available only at certain times, in limited quantities, to keep resource utilization at a constant level. Can lead to a new critical path.

Schedule compression techniques includes fast track, crash, reduce scope and cut quality. Could save cost and resources, increase risk and requires good metrics.

Monte Carlo Analysis makes use of 3 estimates for each activity and network diagram. The simulation can tell you the probability of completing the project on any specific day, for any specific amount of cost, of any activity actually being on a critical path and overall project risk.

Calculate Float, Critical Path, Near Critical Path from Activity, Predecessor, Duration, Each Activity Early Start, Early Finish, Late Start, Late Finish.
Start à AD (9 days) or ACF (12 days) or BCF (11 days) or BE (9 days) à End




Chapter 7 - Cost Management                                                   (10 Questions)
Estimate Cost
Determine Budget
Control Cost
Type of Cost
Cost Management Plan

Funding Limit = 130K
Project Cost = 100K
Unknown Risk = Management Reserve = 10K
Cost Baseline = 120K
Contingency Reserve is money spent for known unknown = 20K

Earned Value Technique
PV – Planned Value is estimated value of the work planned to be done.
EV – Earned Value is estimated value of work actually accomplished.
AC – Actual Cost incurred of the work accomplished.
BAC – How much is the budget at completion
EAC – How much do we expect the total project to cost at completion?
ETC – How much more do we expect the total cost to be at completion
TCPI based on BAC: BAC-EV/BAC-AC
TCPI based on EAC: BAC-EV/EAC-AC
You can use contingency reserve without approval, mgmt reserve need a
Benefit Cost Ratio, Expected Revenues/Expected Costs
Measure benefits to costs, not just profits.
Law of Diminishing Returns. Life Cycle Cost.

The construction company had a project to excavate 5000 sqft of land.
They had planned o excavate 1000 sqft per day – thereby taking 5 days to complete the project. Their total cost budgeted was 10,000$
At the end of day 4, they had finished excavating 3500 sqft and had spent 8200$.
Calculate PV, EV, AC, BAC, CV, CPI,

Budgeted cost of work scheduled or performed.
PV=8000$                                    (we should have completed, BCWS)
EV=3500 sqft = 7000$    (we have completed BCWP)
AC=8200$                        (we have spent           ACWP)
CV= EV-AC -1200           (we are over budget by $1200)
SV= EV-PV -1000          (we are behind schedule)
CPI=EV/AC 0.85                        (we are getting back 85c for every dollar spent)
SPI=EV/PV 0.87               (we are progressing at 87%)
BAC=Project Budget – 10000$ (project budget)
EAC= BAC/CPI or AC + ETC = 11764 (we estimate now to cost $11764)
ETC=EAC-AC = 3564   (we require another $3564 to complete the project)
VAC=BAC-EAC -1764   (we will overspend $1764)

8) Quality Management                                                              (13 Questions)

Plan Quality creates a Quality Management plan, mostly done during project planning
Perform Quality Assurance for continuous improvement, correct deficiencies.
Is an audit process, during execution output are deficiencies
Quality Control measures project results against standards.
Is a product testing during monitoring and controlling output is defect and variations.
Quality Management Plan   defines how quality will be implemented, measured, controlled and tracked. Includes approaches for QA, QC and continuous improvement
Quality Control Tools
·         Cause and Effect Diagram, aka ishikawa or fishbone diagram find root cause
·         Histogram,  bar diagram plots frequency of variable
·         Pareto Chart, follows 80-20 principle, variables sorted high to low frequency
·         Flowchart, helps to draw the process and analyze the process
·         Run Chart, used for plotting any variables, used for trend analysis
·         Scatter Diagram, helps identify co-relation
·         Control Chart, control upper and lower limits
·         Cost of Quality (CoQ)


      9) Communication Management                                               (12 Questions)

Identify Stakeholders
Plan Communication
Distribute Information
Manage Stakeholder Expectations
Report Performance
Stakeholder Register
Stakeholder management strategy
Communication model i.e. Encode, Decode, Medium and Noise
Type of communication
Rules of a meeting
Barriers to communications
Forecasting Methods
Communication channels n(n-1)/2, where n = no of individuals.  5 people 5(4)/2 = 10

Communication Method is Pull, Push and Interactive


10) Human Resources Management                                          (5 Questions)
Develop HR plan
Acquire, Develop, Manage Project team
Types of power – legitimate, coercive, reward, expert, referent.
Organization chart OWR/BS, RAM, RACI= responsible, accountable, consult, inform
Team Building activities – forming, storming, norming, performing and adjourning
Conflict Management – Problem solving or confronting (win-lose), compromising, smoothing, withdrawal or avoiding (lose-lose), forcing and collaborating
Motivational Theory- Maslow’s hierarchy theory and McGregor x and y Theory

11) Risk Management                                                                 (5 Questions)
Plan risk management
Identify Risk                                               
Perform Qualitative Risk analysis
Perform Quantitative Risk analysis
Plan risk response
Monitor and Control Risk
Monte Carlo Analysis
Risk Response Strategies – Share Exploit Enhance, Accept, Avoid, Transfer Mitigate.
Contingency Reserves account for known unknowns
Management Reserves account for unknown unknowns.

12) Procurement Management                                                  (10 Questions)
Plan, Conduct, Administer, Close Procurement
Procurement Documents, Evaluation Criteria
Types of Contract
CPPC – Cost Plus percentage of cost
CPFF – Cost Plus fixed fee, limits fees for large projects with limited scope definition
CPIF – Cost Plus Incentive Fee
CPAF – Cost Plus Award Fee, risky for buyer
T&M Contracts
Fixed Price Contracts, risky for seller

Fixed price contracts are the riskiest to the Seller.
CPAF contracts are the riskiest to the Buyer

13) Professional and Social Responsibility                                (20 Questions)